- Prefabrication and assembly of light and medium carpentry
- Prefabrication and assembly of industrial tanks
- Creation of Pipe racks
- Supply, prefabrication and assembly of low, medium and high pressure pipes (P11 - P22 - P91 - P92 - Super Inox), stainless steel pipes 304, 308, 316
- Assembly and repair of pressure vessels
- Prefabrication of nuclear waste drums and overpacks
Oil & Gas, Nuclear, Energy production plants (Thermoelectric power plants, Waste-to-energy plants)
Annual production capacity
Main Customers / Relevant Partnerships
Enel Produzione s.p.a., Hera s.p.a., Sogin s.p.a., A2A s.p.a., Sorgenia s.p.a., Nucleco s.p.a., Enel Green Power s.p.a.
Carbon steels, low alloy steels, stainless steel, duplex, nickel alloys
Maximum and minimum thicknesses
From 2 mm to 40 mm, it can vary depending on the component and the specifications required
Maximum component dimensions
12000x3000x3000, but may vary based on the component and required specifications
Main production processes
Welding (electrode, MIG, TIG), laser cutting (3000x1500, max thickness 20 mm carbon steel, max 15 mm stainless steel), plasma cutting (6000x2000 thickness 30 mm), sheet metal calendering (thickness 20÷25mm)
Certifications and qualifications
Company certifications :
- Application Model 231
- ISO 14001:2015
- ISO 45001:2018
- ISO 37001:2016
- ISO 30415:2021
- UNI EN ISO 14064-1:2019
- EN ISO 3834-2
- EN15085-2:2020
- EN 1090-1:009+A1:2011
- SA 8000:2014
- ISO 9001:2015
- UNI Pdr 125/2022
- SOA OG9 - 6th CLASS
- SOA OS18A - 8th CLASS
Authorizations and qualifications : PED
Welder qualifications / procedures: - Welders: UNI 9606-2 / ASME XI / UNI 9606-4 / UNI 14732
- PQR: UNI 13614-1